P&L Construction Ltd. builds new homes and structural renovations across Metro Vancouver — for cost-effective design, a prompt response, and optimal solutions. P&L建筑有限公司承建大温哥华地区的新建住宅与结构性装修——经济高效的设计、及时的响应、最佳的解决方案。
P&L Construction Ltd. is a highly efficient construction company based in Metro Vancouver, British Columbia. We offer construction services throughout the Lower Mainland, from new single-family homes to structural renovations and permit-ready engineering drawings.P&L建筑有限公司是一家位于卑诗省大温哥华地区的高效建筑公司,服务范围涵盖低陆平原——从新建独立屋到结构性装修,再到可申请许可的工程图纸。
Our hands-on approach means you work directly with the same builder from the first phone call through to the final walkthrough — one point of contact managing permits, engineering, and every stage of construction.我们采取亲力亲为的方式——从第一通电话到最终验收,您始终与同一位建筑师直接沟通,由其统一负责许可、工程及施工的每个阶段。
“For cost-effective design, prompt response, and optimal solutions.”“经济高效的设计,及时的响应,最佳的解决方案。”P&L BC Construction Ltd.
Ground-up construction from site review through occupancy. Site review, zoning check, permit set and P.Eng-sealed structural drawings where required, then construction through to the final walkthrough.从现场评估到入住,全程承建新屋。现场评估、分区核查、许可文件,以及市政要求时的工程师盖章结构图纸,直至竣工验收。
Second-storey additions and work through load-bearing walls — the kind of renovation that needs a permit and a sealed structural drawing, arranged and inspected the same way a new build is.二层扩建及承重墙相关工程——这类装修需要许可证和盖章的结构图纸,按新建房屋同等标准安排与查验。
Plans, drawings and documents sealed by a professional engineer, arranged as part of the job wherever a municipality requires one before issuing a permit.由专业工程师盖章的图纸与文件,凡市政要求核发许可前需要提供的,均作为项目的一部分统一安排。
A second-storey addition and load-bearing wall renovation, built with a municipal permit and a P.Eng-sealed structural drawing, inspected at every stage through to the final walkthrough.一项二层扩建及承重墙装修工程,依市政许可及工程师盖章结构图纸施工,每个阶段均经查验,直至最终验收。
A call or site visit to discuss your vision, lot, and rough budget.电话或现场沟通,了解您的想法、地块及大致预算。
Plans and a sealed structural set where required, submitted for the building permit.绘制图纸,必要时提交盖章结构图纸,申请建筑许可。
Scheduling and site prep before the first wall comes down.动工前的排期与现场准备工作。
Framing through finishing, inspected at every stage the permit requires.从框架到装修完工,依许可要求逐阶段查验。
Keys handed over, and the 2-5-10 warranty period begins.交付钥匙,2-5-10年保修期正式启动。
“He gave me the scope in writing before I signed anything — not after, like the last contractor I called.”“他在我签约前就把工程范围写清楚了——不像上一位承包商,签完才告诉我。”